Lawyers Weekly - legal news for Australian lawyers

Powered by MOMENTUM MEDIA
lawyers weekly logo

Powered by MOMENTUM MEDIA

Goodbye job applications, hello dream career
Seize control of your career and design the future you deserve with LW career

Deals 29 July

Allens Arthur Robinson recently acted for the Commonwealth Bank of Australia, Westpac and WestLB as financiers on Alinta’s second $121.5 million, 140MW cogeneration plant at Pinjarra in WA. The…

user iconLawyers Weekly 29 July 2005 Big Law
expand image

Allens Arthur Robinson recently acted for the Commonwealth Bank of Australia, Westpac and WestLB as financiers on Alinta’s second $121.5 million, 140MW cogeneration plant at Pinjarra in WA. The cogeneration arrangements involved Alinta supplying steam to Alcoa for refinery use and supplying electricity into the southwest WA electricity grid. The two plants and Alinta’s Walkaway Wind Farm near Geraldton will add up to 370MW of electricity to the state’s grid within two years.

 
 

A year’s supply of electricity from the cogeneration unit will produce 450,000 tonnes less in greenhouse emissions than a similar sized coal fired plant. Phillip Cornwell, AAR’s practice group leader for project finance said Alinta aimed to install more cogeneration units at Alcoa’s refineries.

Tags
Comments (0)
    Avatar
    Attach images by dragging & dropping or by selecting them.
    The maximum file size for uploads is MB. Only files are allowed.
     
    The maximum number of 3 allowed files to upload has been reached. If you want to upload more files you have to delete one of the existing uploaded files first.
    The maximum number of 3 allowed files to upload has been reached. If you want to upload more files you have to delete one of the existing uploaded files first.
    Posting as
    You need to be a member to post comments. Become a member for free today!